Skip to content
← All Projects

Commercial / Tokyo, Japan / 2024

Zenith Studio

A photography studio where the light was the product, and the interior had spent a decade fighting it.

Shooting floor with a full-height dark marble wall and a polished screed underfoot
CONCRETE / TOKYO
Scope
Interior architecture, lighting, material specification
Area
285 sqm
Duration
8 months
01

Problem

  1. 01 Amber cast from the oak floor
  2. 02 3000K fighting 6500K north daylight
  3. 03 No neutral reference surface anywhere
02

Design Approach

Every surface in the shooting volume was specified by spectrophotometer — honed concrete, neutral plaster and a seamless cyclorama held within 0.4 delta-E. Warm timber and the original brick survive in circulation and the viewing area, screened from the floor so they cannot enter a frame.

03

Result

The same floor rebuilt in neutral tones, lit entirely by the north clerestory
The original client office, fitted before the studio floor beyond it was rebuiltBefore
After
Drag to compare
The shooting volume under north daylight alone
NORTH LIGHT
Warm timber client viewing area, screened from the shooting floor
VIEWING / TIMBER
The approach corridor in neutral plaster, kept dark so the shooting floor reads bright
NEUTRAL / APPROACH
retouching per shoot day
-2 hrs retouching per shoot day
max delta-E across shooting surfaces
0.4 max delta-E across shooting surfaces
colour temperature on the floor, from two
1 colour temperature on the floor, from two
“For eleven years I corrected my own building in post. I did not realise that was a choice.”
— Studio Principal, Meguro

The building stopped appearing in the photographs.

Next Project

Jakarta Boutique Hotel

Hospitality / Menteng, Jakarta

Warm timber joinery lining the approach to the guest rooms, lit from within the shelving
TIMBER / MENTENG

Facing something similar?

Let us look at your space.